Du Long Industrial Park

Dec 20, 2025
0 lượt xem
Du Long Industrial Park

DU LONG INDUSTRIAL ZONE

GENERAL INFORMATION

 

Investor

Investor Name: Hoang Thanh Du Long Industrial Park Infrastructure Investment Joint Stock Company

▪ Phone : 096.230.5757
Email : dulongip@hoangthanh.vn
▪ Website:
www.dulongip.vn

Contact Person

Name - Title - Mobile Phone: - Email of the person in charge

NGUYEN VAN SANG – Deputy Director – 0905364055 sangnv@hoangthanh.vn

Location

Surrounding areas:

- Located 30 km from Cam Ranh Port, Khanh Hoa province;

- Located 25 km from Ba Ngoi Port ;

- Located 50 km from Ca Na General Port ;

- Located 370 km from Ho Chi Minh City by road.

Investment sector

Electronics and information technology; high-tech industries as defined in Decision No. 38/2020/QD-TTg dated December 30, 2020, of the Prime Minister on the promulgation of the list of high technologies prioritized for development and the list of high-tech products encouraged for development; automobile and motorcycle assembly technology; mechanical engineering, manufacturing of agricultural and industrial machinery; construction materials industry; processing of agricultural, forestry, and aquatic products (processing of products from agriculture and forestry such as chemicals from agriculture and forestry, seafood processing, etc.); consumer goods production (textile industry, garment industry, leather and footwear industry and supporting industries for the textile and garment industry, other consumer goods production industries, etc.); warehousing area (construction of transit warehouses, logistics services) .

minimum wage

Maximum and minimum regional wages according to Decree 38/2022/ND-CP

Lease term

▪ Start date: 2007

▪ End date: 2057

Minimum rental area

01 ha

Building height limit

-        Factory building area: 2 floors

-        Administration area : 2 floors

Permitted building ratio

70%

Planned area

▪ Total area: 407.28 ha

▪ Total industrial land area available for lease: 288.5 hectares

▪ Total area with complete infrastructure ready for factory construction: 288.5 hectares

Operating status

▪ Currently active

 

Files